top of page

C.R.Bard - Covington, Georgia Energy

Energy Savings Case Study

C.R. BARD is a medical device manufacturer with 20 plants located in the United States and around the world. C.R. BARD is one of the largest medical device manufacturers in the world. Understanding the need to reduce their energy costs, while also increasing their electrical efficiency standards, drove them to undertake an energy efficiency project with Enegy Integrated Solutions at three of their Georgia facilities. Since this installation, EIS has successfully undertaken 11 other C.R. Bard sites in the USA, Mexico and Asia.

Subject Information

Facility: C.R. Bard - Covington, GA

Facility Type: Medical Manufacturing

Facility Size: 453,000 sq. ft.

Savings Analysis

Projected

Actual

Monthly Savings

19.96%

26.2%

Payback Period

34.9 months

26.7 months

Technology Used

EASILiners, PowerLiners, Lighting Upgrades, EASI Optimizer, ERV, Frigi‐Tech

Annual Environmental Benefits

  • 3,288,430 lbs CO2

  • 1,223 barrels of oil

  • 928 tons of coal

  • 24,829 lbs of SO2

  • Equivalent to removing 311 vehicles

Additional Benefits

  • Motors run cooler

  • Improved lighting quality

  • Standardized lighting in the entire facility

  • No special training or employee involvement

  • Increased electrical capacity

CASE STUDIES

"The planning was very thorough, and the execution was flawless."

Plant Engineer, Mondelez International

News

Energy Integrated Solutions, Inc. (EIS)
 

1040 Boulevard SE, Suite D

Atlanta, GA 30312 USA

Office:
404-937-6547

 

Email: 
contactEIS@energyintegratedsolutions.com

bottom of page