top of page

GE - Roper Energy

Energy Savings Case Study

 

General Electric (GE) is an American multinational conglomerate corporation incorporated in Schenectady, New York and headquartered in Fairfield, Connecticut in the United States. EIS performed a number of installation for GE facilities, including an installation located in GE's Roper stove manufacturing plant in North Georgia. The results to date have been outstanding, exceeding the promised savings level by almost 30%.

Subject Information

Facility: GE - Roper

Facility Type: Manufacturing - Appliances

Facility Size: 1,200,000 sq. ft.

Savings Analysis

Projected

Actual

Monthly Savings

10.1%

21%

Payback Period

27 months

11 months

Technology Used

EASI Liners, PowerLiners, Lighting Upgrades, EIS Optimizer, Elspec, Frigi‐Tech

Annual Environmental Benefits

  • 4,368,000 lbs CO2

  • 1,625 barrels of oil

  • 1,233 tons of coal

  • 32,980 lbs of SO2

  • Equivalent to removing 406 vehicles

Additional Benefits

  • Motors run cooler

  • Improved lighting quality

  • Standardized lighting in the entire facility

  • No special training or employee involvement

  • Increased electrical capacity

CASE STUDIES

"The planning was very thorough, and the execution was flawless."

Plant Engineer, Mondelez International